01 / ICICI Lombard · Enterprise product design · Motor claims
My role
End-to-end product design (sole designer)
Scope
Research · Strategy · Information architecture · Interaction design · UI · Design validation · Developer handoff
Collaboration
Product, business, operations and engineering
Status
Phased rollout
02 / Brief
FastTrackClaim details
IL AutoCareStatus
DistaLocation
OTTO BuddyEstimates
NYSA Break-inPhotos
EmailApprovals
People reconstruct the claim by phone, email and memory.
Claim Manager
Field Executive
Customer
Shared claim context
Claim identityAssignmentEvidenceStatusApprovals
Garage
Investigation
Legal
Each role acts on the same claim, with its own actions and permissions.
Conceptual synthesis, not a deployed technical architecture.
03 / Planning & strategy
Strategy canvasProcess reconstructed for this case study
- 01Understand the workField observation, stakeholder inputs and PRD analysis.Driver observation in Mumbai · Claim Manager and investigator discussions
- 02Map the dependenciesDecisions, custody, evidence and ownership across roles.Who decides, who holds the vehicle, who proves what
- 03Design the systemReusable patterns, role-specific workflows, exception states and controlled handoffs.One claim context, different views per role
Context travels
The next person should not have to reconstruct the claim.
Clarity before density
Surface what needs action, not everything the system knows.
Evidence by design
Make required proof and completion conditions visible.
Human judgment stays central
Automation assists decisions; it does not silently replace accountability.
04 / Ecosystem
Ecosystem explorer · select a role
Shared claim contextClaim identityAssignmentEvidenceStatusApprovals
ResponsibilitySurvey and operational decisions
ReceivesClaim details, QC, evidence
Passes forwardApproval or hold, next action
Path selector
Core operational path
- Intimation
- Survey
- Repair approval
- Repair / assessment
- Delivery / closure
Verticals in scope, with different workflows:OD/PTThird PartyTotal TheftPersonal Accident
05 / Design decisions
Decision A
Claim Manager · three statesPrinciple · Clarity before density
- 1Dashboard
- Urgency buckets by survey turnaround
- Pending decisions as an action queue
- 2Pre-survey context
- QC flags surfaced before the decision
- Claim, policy and vehicle context in one place
- 3Repair approval
- Explicit decision submission
- Investigation as a deliberate branch
Decision B
Handoff sync · pickupPrinciple · Context travels
Field Executive
Sees: Route, ETA confirmation and customer details
Shared event
Job started · ETA shared with customer
Customer
Sees: Representative name, photo and live ETA
Decision C
Before · stencil by stencil
1
2
3
4
5
6
7
8
9
10
11
12
Each of 11–12 angles opened as its own stencil: open, capture, confirm, return.
After · one camera flow
- 1Open the camera once
- 2Guided angles in sequence
- 3Tag damage in place
- 4Review and submit
The same required evidence, in one continuous session.
Principle · Evidence by design
~1 min
saved per full vehicle capture in a preliminary micro-test. Sample and protocol to be verified.
Offline capture and background sync are requirements of the flow; network reliability has not been validated.
Decision D
Evidence to decisionPrinciple · Human judgment stays central
Generated discrepancies are grouped by theme. Each shows its source and confidence, and the manager explicitly selects what matters.
Source on every itemHigh confidence · sources conflict · evidence missingExplicit selection
Generated content is a draft for review, not verified legal advice. No accuracy claims are made for the model.
06 / Deliverables
Claim Manager
Owns survey and operational decisions, from urgency queue to repair approval.
DeliverablesRole-based journeysShared interaction patternsComponent foundationsDesign specificationsDeveloper handoff
07 / Outcomes
Preliminary observation
~1 min
Saved per full vehicle capture in a micro-test. Protocol and sample not yet documented.
Delivery progress
Partially live
Claim Manager, dashboard to repair approval, as of 19 Oct 2026. Assessment, work order and delivery order rollout pending.
Design scope
Designed
Field Executive, customer tracking, garage, investigation roles and legal: designed and handed over.
Next measurement
Task durationEvidence completeness and retriesHandoff exceptionsApproval turnaroundRole-level adoption
Compare equivalent claim types before attributing business changes to design.
08 / Reflection
Made it this far?
Good things start
with
a hello.
Feel free to reach out,
Designed with
By Lalitya Krishnan
ᐧ
© 2026 All rights reserved





